
Selective Pallet Rack
The most universal pallet racking system for direct access to every pallet position.
Mooresville operators sit close to the I-70 and SR 67 freight routes without paying airport-corridor rent, which is a good position until the building runs out of pallet positions. When that happens, the usual first move is stacking product in the cross aisles, and productivity drops from there. Indianapolis Pallet Rack puts the floor back to work. We produce a CAD layout with a real pallet position count for your building, an itemized quote, and an install schedule that keeps your dock running.
Morgan County buildings vary a lot in height and age. The layout starts with what your building actually measures, not an assumption.
Mooresville's industrial space along SR 67 and out toward Camby covers everything from newer distribution buildings to older shop and warehouse combinations. There is no single spec that fits them all.
So we measure first. Clear height to the lowest obstruction, column spacing, dock positions, and forklift type all shape the layout, and getting those four right accounts for most of the difference between a good pallet count and a mediocre one.
We are twenty-five minutes from Mooresville on I-70, which keeps delivery quick on standard uprights, beams, and decking. Adding bays later or replacing a damaged component does not turn into a multi-week wait.
Our crews work the SR 67 corridor toward I-70 in Morgan County, including:

It starts with a phone call and four numbers: your pallet dimensions, your average and maximum pallet weight, the forklift you drive, and the clear height from the floor to the lowest overhead obstruction.
From there we produce a CAD layout of your building showing rows, aisle widths, beam elevations, and a pallet position count. You see how many pallets the space holds before anything is ordered.
The quote that follows is itemized — frames, beams, wire decking, pallet supports, row spacers, and protection listed separately, so you can see what each part of the system costs and adjust the scope if you want to.
Once approved, standard components usually ship within 48 hours and our installation crews handle the rest. The system goes in anchored, plumbed, and capacity-tagged, phased around your receiving and shipping schedule so the dock keeps moving.
What you end up with is a rack layout sized to your operation, a documented load capacity for every beam level, and one local number to call when you want to add a row or replace a component.
Call and you will reach the people who lay the systems out, not a call center.
(317) 659-6552These three come up most often in Mooresville buildings, but we stock and install the full range.

The most universal pallet racking system for direct access to every pallet position.

High-density storage where pallets are loaded from a single aisle.

Open-front design for long, bulky, or irregularly shaped items.

High-density storage for large quantities of similar products.

First-in, first-out (FIFO) system with gravity-fed lanes.

Hand-picking system with gravity-fed wheel conveyors.
Racking our crews have installed for warehouses in and around Mooresville and the wider Indianapolis metro.










Send us the basics and we will come back with a CAD layout, a pallet position count, and an itemized quote.
Before designing your pallet rack system, there are several key factors to consider. Our warehouse design specialists will help you answer these questions during your free consultation.
Our crews cover the metro, so a project just outside Mooresville runs on the same delivery times and the same installation teams.
Call (317) 659-6552 or request a free quote and warehouse design consultation.