Cantilever Rack in Shelbyville, IN
Long fabrication or agricultural-supply materials near Shelbyville's industrial corridors can occupy the floor because the palletized inventory dominates the existing rack plan. Regional stock can mix broad SKU variety with a small number of high-volume pallet lines. That makes keep long-load support and turning space visible in the combined drawing a practical design question for this building, not a reason to order the largest system in a catalog. Cantilever Rack in Shelbyville, IN starts with understanding that constraint. Cantilever warehouse racking supports long materials on arms extending from columns, with no front beam across the loading face. Bundle length, stiffness, weight, and handling method decide the support pattern. A long load needs sufficient support along its length as well as room to be picked and turned.
Send your floor plan and load information or call (317) 659-6552; we will work through the fit before quoting.
Why Shelbyville Warehouses Work With Us
Shelbyville sits along I-74 between Indianapolis and points east, with industrial activity around Progress Parkway and SR 44. Regional distribution can mean a broad item list, while manufacturing or agricultural supply may concentrate volume in only a few load families. We separate those inventory patterns before recommending a deep-storage system. The same theoretical lane count can serve one operation well and leave another with partly empty positions. Actual peak quantities, handling equipment, and order frequency make the comparison useful. Delivery and installation planning also needs to account for how receiving space will stay available while storage zones change.
For this cantilever rack project, the specific task is to keep long-load support and turning space visible in the combined drawing. We calculate arm capacity and support spacing from the actual material, not a universal spacing rule. Single-sided and double-sided runs have different access and base requirements. The drawing also shows how a loaded truck approaches the arms, because storage that fits on paper can still be awkward to retrieve when a long bundle enters the aisle.
As a division of Warehouse Equipment & Supplies Co., we bring storage-layout, quoting, and installation experience dating to 1997. Your consultation uses the measurements and photos you provide. You get the proposed layout and itemized scope before committing, with one contact to coordinate questions about delivery, installation, and later changes.


Operations We Rack Around Here
Nearby areas we work in regularly include I-74 corridor, Shelbyville industrial park, Progress Parkway area, SR 44 industrial.
How Cantilever Rack Works
Arms with nothing in front of them, built for lumber, pipe, and anything a pallet can't hold.
Columns and anchored bases
Upright columns sit on bases anchored to the floor. Base depth is set by load and arm length so the run stays stable even under an off-center pick.
Arms at adjustable heights
Arms bolt or pin into the column at set increments and move as your product mix changes. Straight arms suit boxed goods; inclined arms with a lip hold round or loose stock in place.
Column spacing against sag
Spacing between columns is set so bundles don't sag between arms. A common starting rule places arms about half the load length apart, with the ends overhanging evenly.
Single-sided or double-sided
Single-sided runs go against a wall. Double-sided runs stand in open floor and load from both faces, doubling capacity per base without doubling the footprint.
What a Cantilever Rack Project Includes
The Shelbyville project starts with the operating information you provide: bundle dimensions, material stiffness, weight per supported load, arm elevations, and loaded turning space. We also review the floor plan, fixed obstructions, usable height, and the working routes around I-74, Progress Parkway, and the SR 44 industrial area. Your automotive supply, agricultural products, and regional distribution schedule helps identify which zones need immediate access and which can be set aside for installation.
Cantilever specification starts and ends with the load. We collect bundle dimensions, weight per bundle, and how material is handled - forklift forks, a side loader, or by hand off a cart - because that determines arm length, arm capacity, and how much clearance each level needs.
From there we set column height and spacing, choose straight or inclined arms, and decide whether lips are needed to keep round stock from rolling. Single-sided runs get positioned along a wall; double-sided runs get aisle dimensions matched to whatever's moving material in and out.
The quote itemizes columns, bases, arms, bracing, and anchors, with a CAD drawing showing the run, arm levels, and rated capacities per arm. Installation crews anchor bases to the floor, align columns, brace the run, and set arm elevations to the drawing.
The result is arms you can reposition as inventory changes, capacity ratings for every level, and the floor space that long material used to occupy.
Support spacing must suit material stiffness as well as weight. Short bundles may need a different support pattern from long stock in the same run, and loosely packaged materials need their own review. We show the loaded approach and turning space alongside the arm arrangement, then confirm that later level changes remain within the column and base ratings.
Recent Installations
Racking projects completed for warehouses across Central Indiana.










Get a Cantilever Rack Quote for Your Shelbyville Warehouse
Send the basics and we will follow up with a layout and pricing. Prefer to talk it through? Call (317) 659-6552.
Indianapolis Pallet Rack
9105 E 56th St.
Ste J #2291
Indianapolis, IN 46216
(317) 659-6552Monday - Friday: 8:00 AM - 6:00 PM
Cantilever Rack Questions We Hear Most
Other Rack Types We Supply in Shelbyville

Pallet Rack
Every pallet reachable, every time. The baseline we size everything else against.
View details
Pushback Rack
Two to six pallets deep from one aisle, without giving up much reach.
View details
Pallet Flow Rack
Load one side, pick the other, and let gravity enforce first in, first out.
View details
Drive-In Rack
Forklifts enter storage lanes; fewer access aisles leave more floor for bulk pallets.
View details
Carton Flow Rack
Cases advance to the picker instead of the picker hunting for cases.
View details
Warehouse Relocation
Tear down, label, move, and reinstall your warehouse storage systems around the new building and your move dates.
View detailsNearby Areas We Also Serve
Our delivery and installation territory covers Central Indiana, so one team can handle multiple buildings for the same company.
Where We Work
Located in Indianapolis, we serve the entire Greater Indianapolis region with industrial pallet racks and warehouse storage solutions.
Indianapolis Pallet Rack
Address
9105 E 56th St.
Ste J #2291
Indianapolis, IN 46216
Phone
(317) 659-6552Business Hours
Monday - Friday: 8:00 AM - 6:00 PM
Saturday: Closed
Sunday: Closed
Need Cantilever Rack in Shelbyville?
Call (317) 659-6552 or request a quote and we will get a layout started.